Environment

Project for Expansion of the Horta Port - EIA and RECAPE (Detailed Design Environmental Conformity Report)(2007/2008)

Project for Expansion of the Ribeira Grande Geothermal Power Station (Boilers Sector). EIA and RECAPE (Detailed Design Environmental Conformity Report) (2007/2009)

Environmental Impact Assessment of the Évora Resort Tourism Development Project (2007/2008)

Project for Expansion of the Pico Vermelho Geothermal Power Station - EIA and RECAPE (Detailed Design Environmental Conformity Report) (2008/2009)

Port of Porto Novo – Cape Verde. Environmental Impact Assessment (2008/2009)

Detailed Design for the Pias Irrigation Blocks. Environmental Impact Assessment (2008/2009)

Detailed Design for the Environmental Remediation of the Old Mining Area of the Abrutiga Valley - Environmental Impact Assessment (2006/2007)

Pego Combined Cycle Power Station

Noise Map of the Historical Centre of the City of Caldas da Rainha – Lden Indicator (day-evening-night level)

Taveiro Combined Cycle Power Station. Environmental Impact Assessment and RECAPE (Detailed Design Environmental Conformity Report) (2007/2009)

Project for Expansion of the Horta Port - EIA and RECAPE (Detailed Design Environmental Conformity Report)(2007/2008)

The environmental impact assessment comprehended the characterization of the reference situation, the analysis of impacts and proposals for mitigation of impacts, compensatory measures and monitoring.

The following aspects were analyzed:

  • geology, geomorphology and hydrogeology
  • hydrology and hydrography
  • coastal dynamics
  • water and sediment quality
  • ecosystems
  • land use and occupation
  • planning constraints
  • air quality
  • noise
  • socio-economy
  • archaeological and cultural heritage.

The Detailed Design Environmental Conformity Report (RECAPE) was carried out, in conformity with the current legislation.