|

WwTP of the City of Praia
Santiago Island, Cape Verde

Pego Combined Cycle Power Station
- Capacity of 800 MW. Abrantes, Portugal

Structural Reinforcement Works of
the Alcântara Tunnel. Lisbon, Portugal

CIRVER — Integrated Centre for Recovery and
Elimination of Hazardous Waste. Carregueira, Portugal
|
Co-ordination and Supervision of Construction
Construction Quality Management
Site SHE (Safety, Health & Environment) Monitoring
Archaeological Monitoring
Project Detail Design Assessment
Preparation of Tender Documents
Contractors & Service Providers Tender Evaluation
In the following areas:
-
Power generation
-
Dams and hydroelectric schemes
-
Water supply (distribution networks, pumped mains, pumping stations, reservoirs and treatment plants)
-
Wastewater (drainage, pumping stations, outfalls and treatment plants)
-
Hydroagricultural developments (irrigation and drainage)
-
Municipal and industrial solid waste management (landfills, materials recovery, organic waste recovery and waste-to-energy)
-
Transport infrastructure
-
Public transport systems
-
Building
Main Clients
-
SIMTEJO -Saneamento Integrado dos Municipios do Tejo e Trancão, S.A.
-
SIMARSUL - Sistema Integrado Multimunicipal de Águas Residuais da Península de Setúbal, S.A.
-
VALORSUL, Valorização e Tratamento de Resíduos da Área Metropolitana de Lisboa (Norte), S.A
-
LIPOR - Serviço Intermunicipalizado de Gestão de Resíduos do Grande Porto
-
ECODEAL, Resíduos Industriais, SA
-
PB Power (Spain)
-
REFER, E.P.E - Rede Ferroviária Nacional
-
EDIA, Empresa de Desenvolvimento e Infra-estruturas do Alqueva, SA.
|